Generators for sale and hire in the UAE
10 KVA to 1250 KVA, dieselFor hireFor sale
Power & air
Sizes and ratings
Enquire on any line and we'll confirm availability, rate and delivery for your dates.
| Size / rating | Type | Typical duty | Availability | Enquire |
|---|---|---|---|---|
| 10 KVA | Diesel | Site office, single container, tools | Enquire | |
| 20 KVA | Diesel | Two offices plus lighting | Enquire | |
| 30 KVA | Diesel | Small welding set, portable plant | Enquire | |
| 50 KVA | Diesel | Accommodation block, mixed small tools | Enquire | |
| 100 KVA | Diesel | Site cabins plus a tower crane on light duty | Enquire | |
| 150 KVA | Diesel | Batching support, multiple welders | Enquire | |
| 250 KVA | Diesel | Tower crane plus offices, no mains supply | Enquire | |
| 400 KVA | Diesel | Full site power, medium contractor | Enquire | |
| 500 KVA | Diesel | Concrete plant, pumping, mixed loads | Enquire | |
| 750 KVA | Diesel | Large site or standby for a facility | Enquire | |
| 1000 KVA | Diesel | Industrial standby, sustained load | Enquire | |
| 1250 KVA | Diesel | Maximum output, prime or standby duty | Enquire |
In yard: on the ground and ready to dispatch. On request: short lead, usually within the week.
What the hire rate includes
- Serviced, fuelled and function tested before dispatch
- Signed condition report at handover
- Breakdown response and scheduled servicing during hire
- Day, week, month or project duration
Delivery and collection are quoted separately, on top of the rate.
Need a generator on site?
Tell us the load, the location and the dates, and we'll come back with what fits and what it costs, usually the same day.
Sizing guide
Picking the right generator for the job
01
Powering a site with no mains supply
Size for the biggest starting load, not the total. A crane and site offices usually need 250 KVA, even if they run at 120.
02
Standby for a building on mains
Size only for what must keep running, like lifts, pumps and fire systems. Send us that list, not the building's total.
03
A long hire on a fixed programme
Past three months, fuel costs more than the hire. Ask for the fuel curve at 75% load before you pick a size.
Also supplied