Every category is sourced from manufacturers and authorised distributors, available to buy or hire, and supplied with commissioning, operator handover and parts support.
Prime and standby duty, canopied for site noise limits
Sized on starting load, not running load
Tanks, cabling and distribution supplied with the set
Power a site with no mains supply, or hold a building's essential load when the grid drops. We size on the largest starting load rather than the running total.
Diesel on pneumatic tyres for yard and rough ground
Side shift, fork positioners and long forks on request
Warehouse racking through to heavy yard handling. Electric counterbalance where the floor is clean and the air has to stay that way, diesel where the ground is not.
Third-party certified, test certificates on delivery
Licensed operators and rigging crew supplied
Steel erection, plant installation and precast setting. Send us the load, the radius and the ground conditions and we come back with the chart that covers it.
For lifts that run for weeks rather than an afternoon. Crawlers pick and travel under load on prepared ground, which is what makes them the right call on a long programme.
Electric for finished floors, diesel for open site
Wide decks and extension platforms for two-man work
Inspected, certified and function tested before dispatch
A stable platform where the work is straight up and the deck needs room for two people and their material. Electric slab machines indoors, four-wheel-drive diesel outside.
One machine that lifts, reaches and places, loading a slab on the third floor without setting up a crane. Attachments turn it into a loader or a lifting jib on the same shift.
Diesel four-wheel-drive and electric narrow models
Harness points, certification and operator familiarisation
Where a scissor cannot get to the work. Articulated booms reach up and over an obstruction, telescopic booms give the longest straight horizontal reach from one set-up.
Trenching in a confined plot through to bulk earthworks on open ground. Zero tail swing where the boundary is tight, wheeled where the machine has to travel on a finished surface.
Night shift lighting that does not need a fuel run every second day. Solar-hybrid masts hold a full night on battery, which matters most on sites you cannot reach after dark.
Dig at one end, load at the other, and drive itself between work fronts. On small civils and utilities work it does the job of two machines without the second mobilisation.
Moving the machine is half the job. Tell us the type of trailer you need and where the load is going, and we quote the movement with permits and escorts where the load needs them.